Construction Project

Main Street – Streetscape Improvements Phase II

 

PROJECT 2005 – 11

 

The project is designed to restore the pedestrian way and landscaping within the terrace area of Main Street.

Location:          Sweeney Street to Goundry Street

Work:        

The project is approximately 900 feet in length, whose limits of work are from Sweeney to Goundry Streets. The project involves the removal and replacement of approximately 1800 feet of concrete curb with underdrain, the demolition and removal of all asphalt and concrete within the terrace area, to be replaced with new concrete sidewalks, street trees and topsoil and seeding. In addition the existing 55 foot wide roadway (asphalt over brick) pavement will be milled and resurfaced with a truing and leveling course, and a 1 ½  inch top course. New catch basins, piping, and parking area will also be constructed adjacent to Pirson Auto Parts.

            

Work to Begin: Mid August

 

Contractor:       Northeast Diversification

                       

Construction Contact Telephone Numbers:  695-8565

                         North Tonawanda Engineering        8:00am to 4:00pm 

 

Completion: September 30, 2008

 

 

 

  Web Site Updated by David C. Maziarz

Maziarzdave@hotmail.com